Coast Park Stage Two Grange to Tennyson

Published Friday, 19 January 2024

Updated design: shared-use path and nodes

In February 2022, following public consultation, the Minister for Planning and Local Government established a Linear Park along Adelaide’s coastline from Grange to Tennyson.

The Linear Park will include a shared-use path between Terminus Street, Grange and Bournemouth Street, Tennyson.

The design for the Coast Park Stage Two shared-use path and nodes has been further developed.

The sections of boardwalk and concrete path have been designed to best suit the existing natural ground surface whilst minimising earthworks and impacts to the dune system and native vegetation.

You can visit the following links to view the  design plans for the pathway along with designs for the nodes located at or near junctions between the pathway and existing beach access points:

For further information please contact the project team on 1300 060 456 or email dit.coastpark@sa.gov.au.

If you have not already registered for project updates to keep informed on latest news and the progress of the detailed design, please register by visiting www.coastpark.sa.gov.au.