Code Amendment ID: 10046 River Murray Flood Resilience

Policy Live - 4 July 2024

Public Consultation
Closed 25 August 2023

Code Amendment Type CE Led Code Amendment
Overview

The Chief Executive of the Department for Trade and Investment sought to amend the Planning and Design Code to provide clearer guidance for impacted communities to rebuild more flood-resilient development.

The interim amendments to the Planning and Design Code included:

  • requirements around height of floor above ground – the ‘finished floor level’

    • maximum height increased from 2.5 metres to 3 metres, or up to 4 metres to be above the level of a one-in-100-year flood event

    • minimum heights along the river based on updated one-in-100 year flood event data

  • maximum overall building height increased to 8 metres, up from 7.5 metres, with a two-storey cap

  • updated resilient design and materials for underfloor structures

    • installation of roller doors or similar on all four sides of any enclosed area to ensure the free passage of floodwaters

  • maintain open space areas around storage areas, with maximum storage area increased to 60 square metres, up from 15 square metres

  • streamlined assessment for sheds, carports and garages that are located behind a riverfront dwelling, removing previous red tape

  • rezoning flood-affected shack settlements, including Paisley and Murbko, to assist development applications and rebuild efforts.

Due to the urgency of providing clear rules to support redevelopment, the draft Code Amendment came into effect on an interim basis at the same time as being released for community consultation.

Initiated Date 24 May 2023
Designated Entity Chief Executive, Department for Housing and Urban Development
Contact Details

PlanSA
T: 1800 752 664
E: PlanSA@sa.gov.au

LGA Alexandrina
Consultation Period

Start Date: 29 June 2023 at 12:00 am
End Date: 25 August 2023 at 11:59 pm

Submission Details

Contact: PlanSA
Email: PlanSA@sa.gov.au

Consultation complete.

Engagement events

-

Further details

-

Consultation Documents
Document Type Document
Draft Code AmendmentDraft-code-amendment-2804.pdf
Fact SheetSummary-2805.pdf
FAQsFrequently-asked-questions-2806.pdf
Engagement PlanEngagement-plan-2807.pdf
Icon

Initiation

Decision Decision Date
Approved24 May 2023
Icon

Engagement

Round Start End
129 June 202325 August 2023
Icon

Determination

Decision Decision Date
Adopted27 June 2024
Icon

Implementation

Code Version Date Code Amendments Status
14 July 2024Final Determination - Policy Live
Initiation Documents
Document Type Document
Proposal to InitiateProposal-to-initiate-2801.pdf
Approval LettersInitiation-approval-2803.pdf
Affected Area MapAffected-area-map-2802.pdf
Consultation Documents
Round Document Type Document
1Draft Code AmendmentDraft-code-amendment-2804.pdf
1Fact SheetSummary-2805.pdf
1FAQsFrequently-asked-questions-2806.pdf
1Engagement PlanEngagement-plan-2807.pdf
Determination Documents
Document Type Document
Approved Code AmendmentApproved-code-amendment-2808.pdf
Approval LettersApproval-letter-2809.pdf
Engagement ReportEngagement-report-2810.pdf
AppendixEngagement-report-appendices-2811.pdf