Code Amendment ID: River_Murray_Flood_Resilience_Code_Amendment River Murray Flood Resilience Code Amendment

Finalised

Public Consultation
Closed 25 August 2023 at 11:59pm

Code Amendment Type CE Led Code Amendment
Overview

The Chief Executive of the Department for Trade and Investment sought to amend the Planning and Design Code to provide clearer guidance for impacted communities to rebuild more flood-resilient development.

The interim amendments to the Planning and Design Code included:

  • requirements around height of floor above ground – the ‘finished floor level’
    • maximum height increased from 2.5 metres to 3 metres, or up to 4 metres to be above the level of a one-in-100-year flood event
    • minimum heights along the river based on updated one-in-100 year flood event data
  • maximum overall building height increased to 8 metres, up from 7.5 metres, with a two-storey cap
  • updated resilient design and materials for underfloor structures
    • installation of roller doors or similar on all four sides of any enclosed area to ensure the free passage of floodwaters
  • maintain open space areas around storage areas, with maximum storage area increased to 60 square metres, up from 15 square metres
  • streamlined assessment for sheds, carports and garages that are located behind a riverfront dwelling, removing previous red tape
  • rezoning flood-affected shack settlements, including Paisley and Murbko, to assist development applications and rebuild efforts.

Due to the urgency of providing clear rules to support redevelopment, the draft Code Amendment came into effect on an interim basis at the same time as being released for community consultation.

Initiated Date 24 May 2023
Designated Entity Chief Executive, Department for Trade and Investment
Contact Details

PlanSA
T: 1800 752 664
E: PlanSA@sa.gov.au

Submission Details

Consultation completed.

Outcomes

The River Murray Flood Resilience Code Amendment has now been finalised and adopted by the Minister for Planning.

Key changes to the draft Code Amendment following consultation include:

  • identifying a finished floor level of 4 metres is ‘acceptable’ to achieve a level above a one-in-100-year flood event, rather than the ‘maximum’ height permitted
  • including an overall permitted roof height of 5 metres above the finished floor level
  • identifying glass doors are not suitable to avoid floodwater impedance in underfloor areas, outbuildings and agricultural buildings
  • excluding areas for lift facilities in calculating the maximum underfloor enclosed areas
  • increasing the maximum building height to 9 metres in the Rural Shack Settlement Zone (excluding garages, carports and outbuildings)
  • reverting the zone for Ridgeway Estate, Murbko to Rural Zone and retracting finished floor level requirements between the river and the western section of Murbko Road in the estate
  • retracting finished floor level requirements for Tailem Bend where ground level is above the level of a one-in-100-year flood event.

Further information

Consultation Documents
Document TypeDate Document Link
Draft Code Amendment 2023-06-29 14:54:52 Draft Code Amendment (PDF, 7433 KB)
Draft Code Amendment summary 2023-06-29 14:55:04 Draft Code Amendment Summary (PDF, 533 KB)
Frequently asked questions 2023-06-29 14:54:58 Frequently asked questions (PDF, 389 KB)
Engagement plan 2023-06-29 14:54:46Engagement Plan (PDF, 860 KB)
Icon

Initiation

RoundDecisionDecision Date
1Approved24 May 2023
Icon

Engagement

RoundStartEnd
129 June 202325 August 2023
Icon

Determination

RoundDecision Decision Date
1Approved26 June 2024
Icon

Implementation

Code VersionDateCode Amendments Status
2024.1204 July 2024Final approval
Initiation Documents
Document TypeDate Document Link
Proposal to initiate 2023-05-25 16:10:03 Proposal to initiate (PDF, 387 KB)
Letter from Minister - approval to initiate 2023-05-25 16:10:03 Letter from the Minister to the Designated Entity approving the initiation with conditions (PDF, 186 KB)
Affected area map 2023-05-26 08:11:34Affected area map (PDF, 1785 KB)
Consultation Documents
Document TypeDate Document Link
Draft Code Amendment 2023-06-29 14:54:52 Draft Code Amendment (PDF, 7433 KB)
Draft Code Amendment summary 2023-06-29 14:55:04 Draft Code Amendment Summary (PDF, 533 KB)
Frequently asked questions 2023-06-29 14:54:58 Frequently asked questions (PDF, 389 KB)
Engagement plan 2023-06-29 14:54:46Engagement Plan (PDF, 860 KB)
Determination Documents
Document TypeDate Document Link
Approved Code Amendment 2024-06-27 10:25:26 Approved Code Amendment (PDF, 2916 KB)
Approved Code Amendment - summary2024-06-27 11:34:54Approved Code Amendment - summary (PDF, 999 KB)
Letter from Minister - approval 2024-06-27 10:25:25 Approval letter to the Chief Executive of the Department for Trade and Investment (PDF, 106 KB)
Engagement report 2024-06-27 10:25:25Engagement report (PDF, 18273 KB)
Affected area map2023-05-26 08:11:34Affected area map (PDF, 1785 KB)